Bathrooms look like quick projects because the rooms are small, but they pack plumbing, electrical, ventilation, waterproofing and tile into very little space, and each step has to be done in the right order. Knowing how the work unfolds helps you plan around having a bathroom out of service, especially if it's the only one in the house.
Planning and selections come first, and they often take longer than the construction itself. Choosing the tile, vanity, fixtures and lighting, and ordering anything that isn't in stock, can take a few weeks. If the work moves plumbing or changes electrical, a permit is usually needed, and the time to get it varies by city and by how much is changing. We like to have the materials on hand before demolition so the crew isn't waiting halfway through.
Once work starts, demolition usually takes a few days. This is when we find out what the walls and floor are really like. In older Bay Area homes it's common to find rotted subfloor around a toilet or tub, old galvanized pipes or wiring that needs to be replaced. Those repairs are best done now, while everything is open, and they can add a few days to the schedule.
Next comes the rough-in: framing changes, new supply and drain lines, wiring for lights, outlets and the exhaust fan, and any blocking for grab bars or a wall-hung vanity. If there's a permit, this is when the rough inspection happens, before the walls are closed. Then the walls go up, and the shower and wet areas are waterproofed carefully, because that layer is what keeps water out of the structure for years to come.
Tile, paint and finishes take the most visible time. Setting tile, grouting and letting it cure, painting, then installing the vanity, toilet, fixtures, glass and accessories usually takes one to two weeks or more, depending on the amount of tile and the details. A final inspection closes out the permit. All told, a typical bathroom remodel often runs roughly three to six weeks of construction, with more time for larger layouts, custom pieces or special-order materials.